If you use the Warsaw Swing Bridge, you’ll have to make note of an upcoming closure.
Parks Canada will be closing the bridge to vehicular traffic from July 4th at 9 a.m. until July 8th around mid-day and will have traffic control measures and detour routes in place.
The work being done includes selected grating panels of the metal bridge deck being removed, repaired and reattached to the bridge to reduce the noise caused by vehicles using the bridge. Following an observation period during the summer months, similar work may be completed on the remaining grating panels in the fall.
The repair work will not impact navigation along the waterway.